Traffic Management – King St. Closure

During construction of the Minto Street roundabout, King Street will be closed at its intersection with Main Street.

The following traffic management measures will be in place:

  • Stop lights will manage east and west bound traffic at temporary signals
  • King Street closed at Main Street to facilitate roundabout construction at Minto Road
  • Local access maintained via adjacent side streets
  • Detour route signs will direct through-traffic around the closure area
  • Road closure signage in advance of the work zone
  • Pedestrian access maintained where possible

Traffic Management – Toronto St. Closure

During construction of the Toronto Street roundabout, Toronto Street will be closed at its intersection with Main Street.

The following measures will be in effect:

  • Stop lights for east and west bound traffic at temporary signals
  • Toronto Street barricaded through from Main to a distance of approximately 70 metres
  • Road closure signage posted along the detour route
  • Local traffic access only — localized detour route
  • Pedestrian access maintained with signed temporary walkways
  • Emergency vehicle access coordinated with local services